Connected Development has packaged a unique set of predictable and transparent Fixed Price IoT Design Services that aim to help customers reduce costs, optimize design performance outcomes, and accelerate time to market. Gain peace of mind while benefitting from expert-level engineering support.
DESIGN WORKSHOP
Work with our engineering team for a day to review your product ideas and use cases. We will go over the technical aspects and make suggestions as to what technologies and approaches would work best to give you a successful solution.
RF DESIGN REVIEW
If you are looking for a quick RF review to figure out performance issues or just want to make sure that the RF part of the design is optimal, this is a great way to do that. Typically takes 1-2 days with you getting a recommendation report.
CERTIFICATION
We have over a decade of experience in testing and managing certification activities for our customers. By testing your product using our own anechoic chamber, we can determine the RF performance and readiness to pass official certification.
PROOF OF CONCEPT
Using our reference platform as the electronic architectural foundation, we are able to very quickly assemble a representative product solution and get it into our customer’s hands. Great for initial testing and customer feedback to verify use cases.
DESIGN WORKSHOP
PURPOSE
Provide a review of your product’s key requirements and possible hardware/software/certification options.
VALUE
Leverage Connected Development’s deep technical and industry knowledge to receive expert guidance regarding your new or existing product design.
CUSTOMER INPUT
-
Product and Use Case Descriptions
-
Engineering Resource
-
Current Product Information
OUTPUT
-
Market Requirements Document
-
Use Case Analysis
-
H/W and S/W Design Considerations
-
High Level Component Options
-
RF and Certification Considerations
RF DESIGN REVIEW
PURPOSE
Provide a review of your current RF design.
VALUE
Gain access to an experienced RF design team to identify potential
problem areas and recommended changes.
CUSTOMER INPUT
-
Schematics and layouts as necessary
OUTPUT
-
Recommendation Report
CERTIFICATION
PURPOSE
Execute pre-certification RF testing to characterize your product’s performance.
VALUE
Obtain representative RF performance results before engaging a more costly lab for official certification results.
CUSTOMER INPUT
-
Product Samples
-
Engineering Resource
-
Operational Instructions of Product
OUTPUT
-
Testing Results
-
Report
PROOF OF CONCEPT
PURPOSE
Provide a working proof of concept based on your device requirements.
Depending on requirements, time from requirement finalization to POC can be 2 weeks.
VALUE
Prove out the essential concepts of data collection, transmission and use case(s)
in a short period of time before committing more resources.
CUSTOMER INPUT
-
Initial product requirements documents.
-
Any required sensor specifications.
-
Access to engineering resources.
OUTPUT
-
2 devices based on Connected Development’s reference
platform architecture. -
Devices will typically be devkit
based with the appropriate I/O. -
Supporting documentation to
interact with POCs.